6-2-5-snyatie-i-ustanovka-klapana-iac.html
6.2.5. Removal and IAC valve installationModels with the M52 engine
Models with the M52TU engine
|
- Execute the actions described in paragraphs from 1 on 6 Section Removal and installation of the case of a throttle, replacement of its laying.
|
Д/В sockets of pressure and temperature of impellent oil do not separate. |
|
- Turn out a bolt (1) fastening of a box of electroconducting, bolts (2) holders of the valve (3) IAC and take out the IAC valve from an inlet collector together with an arm.
|
|
- Remove the valve (2) IAC from a fixing rubber element (4). Laying (1) between the IAC valve and the inlet pipeline is subject to replacement. But to establish consolidation at repeated installation follows not on the IAC valve, and at first in an inlet collector.
|
- Installation is made upside-down.
|
|
Models with M60 and M62 engines
|
- Execute the actions described in paragraphs from 1 on 3 Section Removal and installation of the case of a throttle, replacement of its laying.
|
- Hang out fastening (1) and take out the IAC valve.
|
|
- Installation is made upside-down. For ensuring tightness sealing rings on the case of a throttle and on the IAC valve should be pure and without damages. In case of damage of sealing rings it is necessary to replace them. At installation first of all it is necessary to establish a sealing ring on a butterfly valve flange.
|
|
|
|
|