|
|
4-5-2-snyatie-i-ustanovka-golovok-bloka-cilindrov.html
4.5.2. Removal and installation of heads of the block of cylindersLeft head of cylinders
|
- Remove the top part of a back cover of a chain of GRM (see. Section Removal and installation of covers of a chain of GRM).
- Remove protection of a case and thermofilters from a beam of the forward bridge at the left and on the right.
- Empty system of cooling of the engine, having turned out the corresponding stopper on the left side of the block of cylinders.
- Turn out spark plugs (see. Head of Control and routine maintenance of the car).
- Remove a collector of system of cooling of the engine.
|
- Weaken collars of a plait of electroconducting (1) and a hose (2) cooling liquids. Disconnect a hose.
|
|
- Take from the holder assembly of the klapanny block of a heater.
|
- Remove the right final collector of the block of No. No. 1-6 cylinders and the left final collector of the block of No. No. 7-12 cylinders (see. Section Removal and installation of final collectors).
- Turn out bolts of fastening of a head of cylinders in sequence, return specified illustrations.
- Clear interfaced surfaces of a head and the block of cylinders of the remains of sealing materials.
|
Do not allow dirt hit to canals of systems of greasing and cooling. |
|
- Establish new laying and tighten new bolts of fastening of a head of cylinders with demanded effort in the specified sequence.
|
- Further installation is made upside-down.
|
|
Right head of cylinders
|
- Remove направляющею щупа level of impellent oil.
- Remove the right final collector of the block of No. No. 1-6 cylinders and the left final collector of the block of No. No. 7-12 cylinders (see. Section Removal and installation of final collectors).
- Execute the actions described in paragraphs with 10 on 13.
|
|
|
|
|