At installation do not forget to establish podkladny plates.
Pull together from the hinge a protective cover.
At installation put fresh greasing on the CV JOINT from the goffered boot and a flange of a leading gear wheel of the main transfer. Insert into the CV JOINT consolidation (1).
Remove the CV JOINT by means of a stripper No. 26 1 070 or No. 26 1 110.
Degrease a gear wreath and put on it fixing Loctite 648 hermetic.
Watch that hermetic did not get on a path of a kacheniye of balls. Sample (1) under consolidation should be turned to a boot.
Establish the CV JOINT and pull it against the stop by means of an opravka No. 23 1 040 or No. 24 1 040.