BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
8.1. Manual box of gear shifting
8.1.1. General information
8.1.2. Removal and RKPP installation
8.1.3. Removal and installation of components of a drive of gear shifting
8.1.4. Major maintenance of a transmission
8.2. Coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

8-1-3-snyatie-i-ustanovka-komponentov-privoda-pereklyucheniya-peredach.html

8.1.3. Removal and installation of components of a drive of gear shifting

Components of installation of a drive of gear shifting

1 — the Fork of inclusion of the V transfer and backing transfer
2 — Crackers
3 — a hinge Finger
4 — the Fork of inclusion of I and II transfers
5 — the Blocking lever

6 — the Screw of fastening of the blocking lever
7 — the Fork of inclusion of III and IV transfers
8 — a clamp Cover
9 — a clamp Spring
10 — a clamp Pin

Components of installation of a drive of gear shifting

11 — the Lock ring
12 — a clamp Cover
13, 15, 27 — a clamp Spring
14 — the Clamp
16 — the Persistent plate
17, 23 — the Screw
18, 29 — Rollers
19 — the Lever of a choice of transfers

20, 24 — the Spring
21 — the Coulisse
25 — the Blocking lever
26 — the Stopper
28 — a clamp Pin
30 — the Rod of a choice of transfers

Gear shifting lever

 PERFORMANCE ORDER

  1. On RKPP GS6-37BZ/DZ (model with the M57TU engine) previously remove system of release of OG and its thermofilter see. Head of the Power supply system and production of the fulfilled gases.
  2. Strong breakthrough remove the gear shifting handle.

The handle at removal do not turn, differently the clamp of angular movings being in the button, it will be cut off. At installation put on the handle the lever, level it and to press not it so that it was noticeably latched.

  1. Slightly compress a frame of a cover of the lever of gear shifting and take a cover from the central console.
  1. Remove sound insulation.
  1. Remove a clamp (1) and a washer (2). Take out draft (3) drives of gear shifting.

At installation grease a finger of draft of a drive of gear shifting.


  1. Insert the adaptation No. 25 1 110 into the bearing and turn it on a corner 90 ° counter-clockwise. Squeeze out up bearing loose leaves from a core of the lever of gear shifting.
  1. Take a rubber cover from an aperture of a body and take out it together with the gear shifting lever in the direction up.
  2. Installation is made upside-down. Pay attention to the next moments.
  1. Put on an internal rubber cover a cup of a core of a support of the lever of switching, and an external cover insert into a body aperture.
  1. Insert a rubber cover an arrow forward if to look in the movement direction.
  1. Press bearing loose leaves, pressing against ledges on a core of a support of a control lever until they will not be fixed.
  1. Grease a spherical part of the lever of gear shifting, insert the gear shifting lever into a core of a support and level bearing loose leaves: shooters on the bearing should be directed parallel to a longitudinal axis of the car, and the ledges holding the bearing, - perpendicular to an axis.

Replacement of a holder of a rod of a choice of transfers

 PERFORMANCE ORDER

  1. Disconnect the driveshaft from RKPP (see. Head Kardanny and power shafts, reducer, differential and stupichny assemblies).
  1. Remove a lock bracket.
  1. Take out draft (1) drive of gear shifting from a holder (2) rods of a choice of transfers and remove washers (3).

At installation grease a finger (4) drafts of a drive of gear shifting. The washer (3) should adjoin to a holder (2) bigger plane.


  1. Pick up the spring ring (1) established in a flute, and displace it a little back. Squeeze out a cylindrical pin (2) up or down from a holder of a rod of a choice of transfers and remove a holder.

At installation grease a spherical part of a rod and replace a spring ring (1).


  1. Check and if necessary replace a rubber washer (1) in a holder (2) rods of a choice of transfers.
  1. Installation is made upside-down. Pay attention to the next moments.


«previous page
8.1.2. Removal and RKPP installation
following page»
8.1.4. Major maintenance of a transmission