BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
6.1. General information and security measures
6.2. Power supply system of petrol engines
6.3. Power supply system of diesel engines
6.3.1. Principles of functioning of control systems of diesel engines
6.3.2. Removal and installation of the case of an air purifier
6.3.3. Removal and turbokompressor installation
6.3.4. Removal and installation of an interkuler
6.3.5. Replacement of the sensor of pressure of pressurization
6.3.6. Removal and installation of the sensor of pressure in the fuel distributive highway
6.3.7. Removal and installation of a regulator of pressure and fuel distributor
6.3.8. Replacement of the valve of an otsechka of supply of fuel
6.3.9. Removal and installation of fuel lines and fuel distributive highway
6.3.10. Removal and installation of the valve of preliminary heating
6.3.11. Removal and TNVD installation
6.3.12. Removal and installation of nozzles
6.3.13. Replacement of a fuel tank, his jellied mouth, and also fuel pump and sensors of a stock of fuel
6.4. Systems of release and decrease in toxicity of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

6-3-8-zamena-klapana-otsechki-podachi-topliva.html

6.3.8. Replacement of the valve of an otsechka of supply of fuel

Below the description for the M51 engine is provided. The valve is established under the inlet pipeline, on the center.


 PERFORMANCE ORDER

  1. In the disconnected condition the piston is put forward under the pressure of a spring and blocks supply of fuel.
1 — the Bringing opening
2 — the distributor Piston
3 — a distributor Head
4 — the Involving magnet
5 — the Chamber of a high pressure
  1. Remove a dustproof cap. Give the nut located under a cap and remove the pipeline from the valve of an otsechka of fuel.
  1. Turn out the otsechka valve a wrench of 24 mm.

The piston and spring can drop out.

  1. Installation is made upside-down. Check correctness of installation and integrity of a sealing ring, in case of need replace it.


«previous page
6.3.7. Removal and installation of a regulator of pressure and fuel distributor
following page»
6.3.9. Removal and installation of fuel lines and fuel distributive highway