BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
6.1. General information and security measures
6.2. Power supply system of petrol engines
6.3. Power supply system of diesel engines
6.3.1. Principles of functioning of control systems of diesel engines
6.3.2. Removal and installation of the case of an air purifier
6.3.3. Removal and turbokompressor installation
6.3.4. Removal and installation of an interkuler
6.3.5. Replacement of the sensor of pressure of pressurization
6.3.6. Removal and installation of the sensor of pressure in the fuel distributive highway
6.3.7. Removal and installation of a regulator of pressure and fuel distributor
6.3.8. Replacement of the valve of an otsechka of supply of fuel
6.3.9. Removal and installation of fuel lines and fuel distributive highway
6.3.10. Removal and installation of the valve of preliminary heating
6.3.11. Removal and TNVD installation
6.3.12. Removal and installation of nozzles
6.3.13. Replacement of a fuel tank, his jellied mouth, and also fuel pump and sensors of a stock of fuel
6.4. Systems of release and decrease in toxicity of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

6-3-10-snyatie-i-ustanovka-klapana-predvaritelnogo-podogreva.html

6.3.10. Removal and installation of the valve of preliminary heating

Below the description for M57 and M67 engines is provided. The valve is in podkapotny space near the left head of the block of cylinders.


 PERFORMANCE ORDER

  1. Unclench collars (1) and the quick-detachable coupling (2).
  1. Remove the valve (3) of preliminary heating.
  2. Installation is made upside-down. If necessary replace a sealing ring of the coupling (2). Replace collars (1) fastening of a hose.
  3. After installation pump over a power supply system, let's TNVD work without fuel (dry).


«previous page
6.3.9. Removal and installation of fuel lines and fuel distributive highway
following page»
6.3.11. Removal and TNVD installation