BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
5.1. System of cooling of the engine
5.2. Systems of heating, ventilation and air conditioning
5.2.1. General information
5.2.2. Removal and heater installation
5.2.3. Removal and installation of a radiator of a heater
5.2.4. Removal and installation of fans and rezistorny assemblies
5.2.5. Removal and installation of the additional water pump and water valve
5.2.6. Removal and installation of deflectors of systems of heating, ventilation and To/in
5.2.7. Removal and To/in compressor installation
5.2.8. Removal of other components of To/in system
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes


5-2-8-snyatie-prochikh-komponentov-sistemy-k-v.html

5.2.8. Removal of other components of To/in system

Evaporator, locking and safety valves

 PERFORMANCE ORDER

  1. Remove the block of heating and К/В.
  2. Remove the broad valve.
  1. Weaken collars from the left and right side and disconnect hoses.
  1. Take out from draft fastenings.

At installation bring both levers into extreme top situation and fix drafts.


  1. Turn out all screws and wring out all clamps of the lower part of the case. Remove the lower part of the case and take out испарител.
  1. Give cap nuts (1) and remove the locking valve (2).

At installation replace sealing rings.


  1. Turn out screws (1) and remove a safety valve (2).

At installation replace sealing rings.

  1. Installation is made upside-down.

Dehumidifier tank

 PERFORMANCE ORDER

  1. Discharge К/В system.
  2. Remove the right air purifier.
  1. Turn out bolts, pull out up soaking-up and pressure head pipelines and закупорьте them if the conditioner remains open more than one hour.

At installation replace sealing rings.


  1. Turn out bolts and pull out up the dehumidifier tank.
  1. Installation is made upside-down.



«previous page
5.2.7. Removal and To/in compressor installation
following page»
6. A power supply system and production of the fulfilled gases









http://b3-b4.ru/