BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
5.1. System of cooling of the engine
5.2. Systems of heating, ventilation and air conditioning
5.2.1. General information
5.2.2. Removal and heater installation
5.2.3. Removal and installation of a radiator of a heater
5.2.4. Removal and installation of fans and rezistorny assemblies
5.2.5. Removal and installation of the additional water pump and water valve
5.2.6. Removal and installation of deflectors of systems of heating, ventilation and To/in
5.2.7. Removal and To/in compressor installation
5.2.8. Removal of other components of To/in system
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

5-2-4-snyatie-i-ustanovka-ventilyatorov-i-rezistornykh-sborok.html

5.2.4. Removal and installation of fans and rezistorny assemblies

The fan of the block of the integrated system of heating and To/in

 PERFORMANCE ORDER

  1. Remove dashboard facing (see. Head Body).
  1. Unclench a clip of fastening of an air line.
  1. Cast away latches of fastening of a cover and remove it. Watch the correct provision of a cover.
  1. Separate the socket, turn out screws and take out the fan.

The fan of the block of the integrated automatic system of heating and To/in

 PERFORMANCE ORDER

  1. Remove dashboard facing (see. Head Body).
  2. Unclench a clip of fastening of an air line (see an illustration).
  1. Unclench the right and left clips of fastening of drafts and levers.
  1. Separate the socket, cut a collar of a plait of electroconducting, turn out screws and uncover.
  1. Turn out screws (by analogy to an illustration) and take out э / the fan motor.
  2. If necessary remove rezistorny assembly as it is described below.
  1. Separate the socket and cut a collar of a plait of electroconducting.
  1. Turn out screws and remove rezistorny assembly.
  1. Installation is made upside-down.

Fan of a back part of salon

 PERFORMANCE ORDER

  1. Remove a decorative overlay of control levers a heater in a back part of salon, and also the control panel the fan (see. Head Body).
  1. Turn out from both parties screws and pull out from fastenings the forward lateral panel of a tunnel.
  1. Turn out screws from the driver.
  1. Unfasten lateral slips on a back ware box from both parties and pull out them from fastenings back.
  1. Turn out the screws located under slips from the left and right parties.
  1. Through an opening liberate from clamps behind (1) and in front (2) decorative panel of a back ware box.
  1. Turn out screws (1-3), separate sockets (4 and 5), unblock a contact block (6) and disconnect it.

Do not damage at removal of the average facing panel the decorative wooden panel of furnish. Shift the average panel (7) for small things forward and up and remove it.


  1. Turn out screws and pull out the wooden panel of a ware box (an average part) forward. Separate the socket (1) (under the wooden panel) and pull out back the holder (2) sockets of a plait assembled.
  1. Turn out the screw.
  1. Raise behind a ware box and turn out screws from the left and right side.
  1. Put forward the fan of a back part of salon from the holder (1) forward and take out back up.
  1. Shift rubber caps and separate the socket (1). Turn out screws (2) and take out the fan of a back part of salon.
  1. If necessary separate the socket, turn out screws and remove assembly of resistors.


«previous page
5.2.3. Removal and installation of a radiator of a heater
following page»
5.2.5. Removal and installation of the additional water pump and water valve