BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
5.1. System of cooling of the engine
5.2. Systems of heating, ventilation and air conditioning
5.2.1. General information
5.2.2. Removal and heater installation
5.2.3. Removal and installation of a radiator of a heater
5.2.4. Removal and installation of fans and rezistorny assemblies
5.2.5. Removal and installation of the additional water pump and water valve
5.2.6. Removal and installation of deflectors of systems of heating, ventilation and To/in
5.2.7. Removal and To/in compressor installation
5.2.8. Removal of other components of To/in system
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

5-2-2-snyatie-i-ustanovka-otopitelya.html

5.2.2. Removal and heater installation

 PERFORMANCE ORDER

  1. Remove hoses (1) system of cooling on a partition of an impellent compartment. Carefully blow supplies to remove the remains of cooling liquid from a radiator.
  1. Lower OZh and disconnect both pipelines (2) on a partition of an impellent compartment. Turn out bolts (3).
  2. Remove a steering column (see. Head Suspension bracket and steering).
  3. Remove dashboard facing, a ware box and rigidity edges with left and on the right side (see. Head Body).
  4. Remove a heater.
  5. Installation is made upside-down. After installation fill To/in system and cooling system. Pump over cooling system.


«previous page
5.2.1. General information
following page»
5.2.3. Removal and installation of a radiator of a heater