BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
4.7.1. Removal and installation of a cover of a head of cylinders
4.7.2. Removal and installation of heads of cylinders
4.7.3. Removal and installation of the top section of the pallet of a case
4.7.4. Removal and installation of the pallet of a case
4.7.5. Replacement of epiploons of a cranked shaft
4.7.6. Replacement of an oil separator of PCV system
4.7.7. Removal and flywheel installation
4.7.8. Removal and installation of a damper of krutilny fluctuations
4.7.9. Removal and installation of driving belts and their natyazhitel
4.7.10. Removal and installation of the oil pump
4.7.11. Removal and installation of maslookhladitel
4.7.12. Removal and installation of the inlet pipeline
4.7.13. Removal and installation of final collectors
4.7.14. Removal and installation of the vacuum pump
4.7.15. Removal and engine installation
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-7-6-zamena-maslootdelitelya-sistemy-pcv.html

4.7.6. Replacement of an oil separator of PCV system

 PERFORMANCE ORDER

  1. Remove a radiator of EGR system and the fuel distributor.
  2. Execute the operations described in sections from 2 on 4 Section the Diesel M67 engine.
  1. Turn out a bolt (1), give cap nuts (2), remove a distributive tube (3).
  1. Give cap nuts (1), remove a distributive tube (2) and disconnect returnable fuel tubes (3). Give cap nuts (4), remove a distributive tube (5) and the fuel (6) distributor.
  1. Give a cap nut (1) and turn out the distributive pipeline (2) in the direction specified by an arrow.
  1. Cut a collar (1) and remove the holder (2) hoses.
  1. Weaken collars (1) and remove hoses (2).
Collars and hoses.
  1. Liberate from a clamp a water hose and disconnect it from a tube of system of cooling.
  1. Turn out bolts (1) and lift the receiver (2) EGR systems. Clear surfaces interfaced to a tube and replace laying of a tube of EGR.
EGR tube.
  1. Turn out bolts.
  1. Slightly raise a tube (1) system of cooling and extend it from the case (2) thermostats.

If necessary replace a sealing ring in the thermostat case.


  1. Slightly raise a plait (1) electroconducting ки and lift the receiver (2) systems of cooling.
  1. Give fixture on perimeter an oil separator flange.
  1. Remove the holder of a plait of electroconducting from a carving pin.
  1. Open a clamp of a water hose (1), disconnect it and remove an oil separator (2) PCV systems.
  1. Installation is made upside-down. Use new laying, establish their dry on previously cleared interfaced surfaces.


«previous page
4.7.5. Replacement of epiploons of a cranked shaft
following page»
4.7.7. Removal and flywheel installation