BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
4.7.1. Removal and installation of a cover of a head of cylinders
4.7.2. Removal and installation of heads of cylinders
4.7.3. Removal and installation of the top section of the pallet of a case
4.7.4. Removal and installation of the pallet of a case
4.7.5. Replacement of epiploons of a cranked shaft
4.7.6. Replacement of an oil separator of PCV system
4.7.7. Removal and flywheel installation
4.7.8. Removal and installation of a damper of krutilny fluctuations
4.7.9. Removal and installation of driving belts and their natyazhitel
4.7.10. Removal and installation of the oil pump
4.7.11. Removal and installation of maslookhladitel
4.7.12. Removal and installation of the inlet pipeline
4.7.13. Removal and installation of final collectors
4.7.14. Removal and installation of the vacuum pump
4.7.15. Removal and engine installation
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-7-5-zamena-salnikov-kolenchatogo-vala.html

4.7.5. Replacement of epiploons of a cranked shaft

For removal and installation of epiploons it is recommended to use special adaptations. For access to the forward epiploon established in the bottom cover of a chain of GRM, remove a damper of krutilny fluctuations. Procedure of ensuring access to a back epiploon below is described.


 PERFORMANCE ORDER

  1. Remove RKPP or AT (see. Head Manual box of gear shifting and coupling or Automatic transmission).
  2. Lower impellent oil (see. Head of Control and routine maintenance of the car).
  3. Remove a flywheel (see. Section Removal and flywheel installation).
  1. Turn out bolts of fastening of a cover of a back epiploon of a cranked shaft.

At installation pay attention to the various ordered moments of an inhaling of bolts of M6 and M8.


  1. Carefully hook an epiploon cover at the basis two screw-drivers and remove it.
  1. Remove laying and clear interfaced surfaces.
  2. Check a condition of aligning plugs and if necessary replace them.
  3. Establish new laying. On sites of joints put a strip (2 mm in width and 3 mm in height) Drei-Bond 1209 hermetic.
  4. The cover of a back epiploon is delivered complete with an epiploon. If necessary take an old epiploon from a cover and press a new epiploon.
  5. Installation is made as it should be, the return sequence of dismantle of components.


«previous page
4.7.4. Removal and installation of the pallet of a case
following page»
4.7.6. Replacement of an oil separator of PCV system