BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
4.7.1. Removal and installation of a cover of a head of cylinders
4.7.2. Removal and installation of heads of cylinders
4.7.3. Removal and installation of the top section of the pallet of a case
4.7.4. Removal and installation of the pallet of a case
4.7.5. Replacement of epiploons of a cranked shaft
4.7.6. Replacement of an oil separator of PCV system
4.7.7. Removal and flywheel installation
4.7.8. Removal and installation of a damper of krutilny fluctuations
4.7.9. Removal and installation of driving belts and their natyazhitel
4.7.10. Removal and installation of the oil pump
4.7.11. Removal and installation of maslookhladitel
4.7.12. Removal and installation of the inlet pipeline
4.7.13. Removal and installation of final collectors
4.7.14. Removal and installation of the vacuum pump
4.7.15. Removal and engine installation
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes


4-7-15-snyatie-i-ustanovka-dvigatelya.html

4.7.15. Removal and engine installation

If the established hoses of naduvochny air are not fat-free also damp, it can lead to turbokompressor failure.


 PERFORMANCE ORDER

  1. Disconnect a negative wire from the storage battery.
  2. Remove the bottom protective casing of an impellent compartment
  1. Turn out bolts and uncover EC compartment).
  1. Separate the socket.
  1. Separate all sockets of electronic blocks (1 and 2) control systems of the engine.
  1. Separate sockets (1 and 2) the relay of candles of an incandescence.
  1. Remove the relay (1) with a socle and safety locks (2). Separate the socket (3), remove a protective cap (4), give a nut and disconnect a positive wire (5) battery rooms of the battery.
  1. Give a nut (1), wring out a clamp (2) and disconnect the diagnostic socket (3).
  1. Remove consolidation (1) and take out a box (2) electroconductings by movement up.
  1. Wring out clamps (1), uncover a box (2) electroconductings, extend from a box a plait of electroconducting and fix it on the engine.

At installation pay attention on directing (3).

  1. Remove a cap of a conclusion of a positive wire of the storage battery.
  1. Give a nut.
  1. Release collars (1), and liberate a positive wire (2) of holders (3).
  1. Remove the holder of oil pipelines of a transmission from the pallet of a case of the engine. Unclench collars of fastening of a positive wire of the storage battery.
  1. Remove AT (see. Head Automatic transmission).
  2. Remove a radiator of system of cooling of the engine (see. Head of System of cooling of the engine, heating, ventilation and conditioning).
  3. Press several times a brake pedal to reduce depression in the vacuum amplifier of brakes.
  4. Press a clamp (1) and at the same time disconnect a vacuum hose together with connection (2).

At installation check a sealing ring of connection and if necessary replace it. Disconnect vacuum hoses (2, 3 and 5) from the vacuum pipeline (6).


Vacuum hoses
  1. Turn out bolts (1) and take aside the vacuum pipeline (2). Wring out a clamp (1) and disconnect топливопровод (3) from the valve of preliminary heating. Open a collar (2), remove топливопровод (3) and fix it on the engine. Disconnect the socket (4), press a clamp (5), disconnect bringing топливопровод (6) and fix it on the engine.
Connections топливопроводов

Collect following fuel.

  1. Unclench collars (1) and remove right (2) and the left (3) pressure head sleeves of naduvochny air.

At installation have collars on former places.

Hoses should be dry and without greasing traces.


  1. Weaken collars (1) and remove a pressure head hose (2) assembled. Weaken a collar (3) on an interkuler and remove a pressure head hose (4) assembled with a pressure head tube.

Hoses should be dry and without greasing traces.


  1. Weaken a collar (1) on an interkuler and remove a pressure head hose (2) assembled with a pressure head pipe. Weaken a collar (3) and take a pressure head hose (4) aside.

Hoses should be dry and without greasing traces.

  1. Remove a natyazhitel of a belt of a drive of the To/in compressor (see. Section Removal and installation of driving belts and their natyazhitel).
  1. Turn out a bolt (1) and unclench a collar (2).
  1. Separate the socket (1), turn out bolts (2), remove the pump GUR (3) from the top section of the pallet of a case and fix the pump a wire on a beam of the forward bridge.
  1. Turn out a bolt (3) and liberate a wire (4) of the holder.
  1. Weaken a collar (1) and remove a hose (2) nadduvochny air together with the pipeline of nadduvochny air.

Hoses should be dry and without greasing traces.


  1. Disconnect soaking-up pipe (1) from a turbokompressor and take a little aside. Turn out bolts (2) fastenings of the To/in compressor, lower the compressor down and disconnect from it an electric wire.

Do not disconnect К/В system pipelines.


  1. Give a nut (1) and remove a wire (2) masses. Give a nut of a pillow (3) support of the engine and disconnect a vacuum hose (4) from the adapter.
  1. Unclench clamps (1 and 3) and disconnect water hoses (2 and 4). Adhere a plait of electroconducting (5) AT to a turbokompressor on the right side. Fix a positive wire of the storage battery behind a flywheel.
  1. Slightly raise the engine for elevating eyes and remove soaking-up tube (1) in the direction specified by an arrow.
  1. By means of the special lift take the engine up from an impellent compartment for forward and back eyes.

Do not damage components in an impellent compartment during engine lifting.

  1. Installation is made in sequence, return to an order of dismantle of components.
  2. After installation before start of the engine check levels of working liquids and if necessary modify them.
  3. After work between a fuel tank and TNVD it is necessary to pump over system of supply of fuel to avoid TNVD work in a dry condition and its damages. For air removal from TNVD execute the following operations:
    1. Disconnect from TNVD bringing pipeline;
    2. Include ignition;
    3. Wait a fuel exit without vials and switch off ignition;
    4. Establish bringing pipeline with a new collar.
  4. Start the engine and make sure of absence of leakages of fuel and working liquids, and also in absence of abnormal noise and vibrations.
  5. Let's to the engine work on single turns, then muffle it and again check levels of working liquids.


«previous page
4.7.14. Removal and installation of the vacuum pump
following page»
5. Systems of cooling of the engine, heating, ventilation and air conditioning









http://b3-b4.ru/