BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
4.7.1. Removal and installation of a cover of a head of cylinders
4.7.2. Removal and installation of heads of cylinders
4.7.3. Removal and installation of the top section of the pallet of a case
4.7.4. Removal and installation of the pallet of a case
4.7.5. Replacement of epiploons of a cranked shaft
4.7.6. Replacement of an oil separator of PCV system
4.7.7. Removal and flywheel installation
4.7.8. Removal and installation of a damper of krutilny fluctuations
4.7.9. Removal and installation of driving belts and their natyazhitel
4.7.10. Removal and installation of the oil pump
4.7.11. Removal and installation of maslookhladitel
4.7.12. Removal and installation of the inlet pipeline
4.7.13. Removal and installation of final collectors
4.7.14. Removal and installation of the vacuum pump
4.7.15. Removal and engine installation
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-7-14-snyatie-i-ustanovka-vakuumnogo-nasosa.html

4.7.14. Removal and installation of the vacuum pump

 PERFORMANCE ORDER

  1. Press several times a brake pedal to reduce depression in the vacuum amplifier of brakes.
  1. Press a clamp (1) and at the same time disconnect a vacuum hose together with connection (2).

At installation check a sealing ring of connection and if necessary replace it.


  1. Turn out bolts of fastening of the vacuum pump.

At installation clear a carving. Use new bolts or put on old bolts Drei Bond 1209 hermetic.


  1. Turn out a bolt on a directing tube щупа level of impellent oil.
  1. Turn the vacuum pump approximately on 30 ° clockwise, squeeze out directing tube (1) щупа from the vacuum pump (2) and remove the vacuum pump.

If necessary replace a sealing ring of the vacuum pump.



«previous page
4.7.13. Removal and installation of final collectors
following page»
4.7.15. Removal and engine installation