BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
4.7.1. Removal and installation of a cover of a head of cylinders
4.7.2. Removal and installation of heads of cylinders
4.7.3. Removal and installation of the top section of the pallet of a case
4.7.4. Removal and installation of the pallet of a case
4.7.5. Replacement of epiploons of a cranked shaft
4.7.6. Replacement of an oil separator of PCV system
4.7.7. Removal and flywheel installation
4.7.8. Removal and installation of a damper of krutilny fluctuations
4.7.9. Removal and installation of driving belts and their natyazhitel
4.7.10. Removal and installation of the oil pump
4.7.11. Removal and installation of maslookhladitel
4.7.12. Removal and installation of the inlet pipeline
4.7.13. Removal and installation of final collectors
4.7.14. Removal and installation of the vacuum pump
4.7.15. Removal and engine installation
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes


4-7-11-snyatie-i-ustanovka-maslookhladitelejj.html

4.7.11. Removal and installation of maslookhladitel

EGR system radiator

 PERFORMANCE ORDER

  1. Remove protection of a case of the engine.
  2. Remove a broad tank of system of cooling (see. Head of System of cooling of the engine, heating, ventilation and conditioning).
  3. Remove the inlet pipeline.
  1. Separate all sockets of a plait of electroconducting between ranks of cylinders.
  1. Slightly raise a plait of electroconducting of the engine, separate the socket from To the/l switch of pressure of impellent oil, take an electroconducting plait aside and fix it.
  1. Disconnect a water hose (1) from an EGR system radiator, weaken a collar (2) and disconnect a water hose (3).
  1. Weaken collars (1), remove right (3) and the left (2) tubes of EGR system.

At installation arrange collars (1) on former places. For installation of the inlet pipeline collars (1) should remain in a free condition.


  1. Weaken collars (1), turn out bolts (2) and remove a radiator (3) EGR systems.
  1. Installation is made upside-down.

Maslookhladitel

At removal of the case of the oil filter some remained amount of impellent oil follows from the case in the space located under it with cooling liquid. To avoid engine damage owing to hit of impellent oil in cooling system, before installation of the case of the oil filter it is necessary to remove engine oil from space with cooling liquid.


 PERFORMANCE ORDER

  1. Remove an EGR system radiator.
  2. Turn out a bolt (1), give cap nuts (2), remove a distributive tube (3).
  3. Execute the actions described in paragraphs with 6 on 12 Replacement of an oil separator of PCV system Undressed.
  1. Uncover (1) polnopotochny oil filter and take out a replaceable filtering element.

Do not allow cover damage, give and tighten it only a face key. After cover removal oil flows down in the case pallet. At installation use new sealing rings of a cover.


  1. Weaken collars (1) and disconnect ventilating hoses (2).
  1. Turn out bolts of fastening of the case of the oil filter and remove it, having pulled vertically up.
  1. Remove laying of the case of the oil filter and clear interfaced surfaces of the remains of sealing materials.
  1. If impellent oil (1) got to OZh, bring together him by means of pure rags. Remove also the remains of impellent oil and OZh from deaf carving openings (arrow) and from cavities (2). Clear interfaced surfaces.
  1. Turn out bolts and remove a maslookhladitel.
  1. At installation replace laying (1), clear interfaced surfaces (2) maslookhladitel (3).
  1. Installation is made upside-down. In summary pump over cooling system.


«previous page
4.7.10. Removal and installation of the oil pump
following page»
4.7.12. Removal and installation of the inlet pipeline