BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.5.1. Removal and installation of covers of heads of cylinders
4.5.2. Removal and installation of heads of the block of cylinders
4.5.3. Removal and installation of the top section of the pallet of a case and oil pump
4.5.4. Removal and installation of the pallet of a case
4.5.5. Removal and installation of covers of a chain of GRM
4.5.6. Replacement of epiploons of a cranked shaft and consolidations of distributors of ignition
4.5.7. Removal and flywheel installation
4.5.8. Removal and installation of a damper of krutilny fluctuations
4.5.9. Removal and installation of driving belts
4.5.10. Removal and installation of the oil pump
4.5.11. Removal and installation of inlet pipelines
4.5.12. Removal and installation of final collectors
4.5.13. Removal and engine installation
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-5-7-snyatie-i-ustanovka-makhovika.html

4.5.7. Removal and flywheel installation

 PERFORMANCE ORDER

  1. Remove RKPP together with coupling or AT (see. Head Manual box of gear shifting and coupling or Automatic transmission).
  2. Fix a flywheel by means of the special adaptation No. 11 2 070 (see an illustration).
  1. Turn out bolts of fastening of a flywheel, remove the coupling of the hydrotransformer (1) and a flywheel (2).
  1. On a flange of a cranked shaft clear carving openings under bolts of fastening of a flywheel.
  1. Installation is made upside-down. The provision of a flywheel is fixed by the special truncated plug. Pay attention that openings in the coupling (1) hydrotransformer and in a flywheel (2) should settle down the friend over the friend. Use new bolts of fastening of a flywheel.


«previous page
4.5.6. Replacement of epiploons of a cranked shaft and consolidations of distributors of ignition
following page»
4.5.8. Removal and installation of a damper of krutilny fluctuations