BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.5.1. Removal and installation of covers of heads of cylinders
4.5.2. Removal and installation of heads of the block of cylinders
4.5.3. Removal and installation of the top section of the pallet of a case and oil pump
4.5.4. Removal and installation of the pallet of a case
4.5.5. Removal and installation of covers of a chain of GRM
4.5.6. Replacement of epiploons of a cranked shaft and consolidations of distributors of ignition
4.5.7. Removal and flywheel installation
4.5.8. Removal and installation of a damper of krutilny fluctuations
4.5.9. Removal and installation of driving belts
4.5.10. Removal and installation of the oil pump
4.5.11. Removal and installation of inlet pipelines
4.5.12. Removal and installation of final collectors
4.5.13. Removal and engine installation
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-5-6-zamena-salnikov-kolenchatogo-vala-i-uplotnenijj-raspredelitelejj-zazhiganiya.html

4.5.6. Replacement of epiploons of a cranked shaft and consolidations of distributors of ignition

Replacement of epiploons of a cranked shaft of the M73 engine is made similar to replacement of epiploons of the M60 engine (see. Section Replacement of epiploons of a cranked shaft).


 PERFORMANCE ORDER

  1. At replacement of consolidation of the case of the right distributor of ignition take out the one-pass valve on the party of No. No. 1-6 cylinders.
  2. Remove the air purifier case (see. The section Removal and installation of the case of an air purifier of Head of the Power supply system and production of the fulfilled gases).
  1. Liberate from clamps a protective casing of the distributor of ignition.
  1. Turn out bolts and uncover the ignition distributor.
  1. Turn out bolts and remove a rotor of the distributor of ignition.
  1. Turn out a bolt and remove a rotor lead.
  1. Turn out bolts and remove the case of the distributor of ignition.
  1. Carefully remove radial ring consolidation, without allowing damage of interfaced surfaces.
  2. Clear interfaced surfaces of the case of the distributor and a cover of a chain of GRM, establish new laying by a consolidation strip to the case of the distributor of ignition.
  1. Connect consolidation to the adaptation No. 11 3 200 completed with the adaptation No. 00 5 500.
  1. Establish the adaptation No. 11 3 220 on a camshaft and center the case of the distributor of ignition (1) concerning a camshaft by means of the adaptation No. 11 3 210.
  1. Further installation is made upside-down. Use new copper washers of bolts of fastening of the case of the distributor of ignition. A lead (1) it is necessary to enter (2) camshafts into dredging.


«previous page
4.5.5. Removal and installation of covers of a chain of GRM
following page»
4.5.7. Removal and flywheel installation