BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.5. M62 engine
4.5.1. Removal and installation of covers of heads of cylinders
4.5.2. Removal and installation of heads of the block of cylinders
4.5.3. Removal and installation of the top section of the pallet of a case and oil pump
4.5.4. Removal and installation of the pallet of a case
4.5.5. Removal and installation of covers of a chain of GRM
4.5.6. Replacement of epiploons of a cranked shaft and consolidations of distributors of ignition
4.5.7. Removal and flywheel installation
4.5.8. Removal and installation of a damper of krutilny fluctuations
4.5.9. Removal and installation of driving belts
4.5.10. Removal and installation of the oil pump
4.5.11. Removal and installation of inlet pipelines
4.5.12. Removal and installation of final collectors
4.5.13. Removal and engine installation
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-5-13-snyatie-i-ustanovka-dvigatelya.html

4.5.13. Removal and engine installation

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the storage battery.
  2. Fix a cowl in extreme top situation. For this purpose disconnect from it a damper, completely open a cowl and fix it bolts at the left and on the right (see an illustration).
  3. Remove thermofilters on the left and right side of a beam of the forward bridge.
  4. Empty cooling system (see. Head of Control and routine maintenance of the car).
  5. Remove RKPP or AT (see. Head of Control and routine maintenance of the car or Engine).
  6. Remove a radiator of system of cooling of the engine (see. Head of System of cooling of the engine, heating, ventilation and conditioning).
  7. Remove covers of air purifiers together with the MAF sensor (see. Head of the Power supply system and production of the fulfilled gases).
  8. Remove the polnopotochny oil filter.
  9. Disconnect from the engine a hose of system of cooling (over the generator).
  1. Disconnect hoses of system of cooling from a heater radiator.
  1. Disconnect a hose from a back part of a collector of system of cooling of the engine.
  1. Remove assembly of the klapanny block of a heater from the holder (see paragraphs 3-5 of the Section Removal and installation of a damper of krutilny fluctuations and its nave).
  2. Separate the socket of a plait of electroconducting of the engine.
  3. Disconnect a positive wire between a starter and the generator and remove a wire of the positive plug of the storage battery in an impellent compartment.
  4. Remove final collectors (see. Section Removal and installation of final collectors).
  5. Remove driving belts (see. Section Removal and installation of driving belts).
  6. Remove a branch pipe обдува the generator.
  7. Remove the pump GUR (see. Head Suspension bracket and steering).
  8. Disconnect the To/in compressor from a basic arm and suspend on a wire aside, without disconnecting pipelines.
  9. Fix on elevating eyes of the engine the adaptation for its posting.
  1. Disconnect a weight wire from the right support of the engine and turn out the top nuts of the left and right pillows of support of the engine.
  1. By means of the elevating device take the engine from an impellent compartment.

Do not damage components in an impellent compartment during engine lifting.

  1. Installation is made in sequence, return to an order of dismantle of components. Be convinced of integrity of pillows of support and if necessary replace them.
  2. After installation before start of the engine check levels of working liquids and if necessary modify them.
  3. Start the engine and make sure of absence of leakages of fuel and working liquids, and also in absence of abnormal noise and vibrations.
  4. Let's to the engine work on single turns, then muffle it and again check levels of working liquids.


«previous page
4.5.12. Removal and installation of final collectors
following page»
4.6. Diesel M57 engine