BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.4.1. Removal and installation of a cover of a head of cylinders
4.4.2. Removal and installation of a head of cylinders, adjustment of phases GRM
4.4.3. Removal and installation of the top section of the pallet of a case
4.4.4. Removal and installation of the pallet of a case
4.4.5. Removal and installation of covers of a chain of GRM
4.4.6. Replacement of epiploons of a cranked shaft
4.4.7. Removal and flywheel installation
4.4.8. Removal and installation of belts of a drive of auxiliary units
4.4.9. Removal and installation of a damper of krutilny fluctuations and its nave
4.4.10. Removal and installation of the oil pump
4.4.11. Removal and installation of the inlet pipeline
4.4.12. Removal and installation of final collectors
4.4.13. Removal and engine installation
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-4-12-snyatie-i-ustanovka-vypusknykh-kollektorov.html

4.4.12. Removal and installation of final collectors

 PERFORMANCE ORDER

  1. Remove protection of a case.
  2. Remove stirring components of system of release of OG (see. Head of the Power supply system and production of the fulfilled gases).
  3. Remove the left thermofilter.

Left collectors

 PERFORMANCE ORDER

  1. Give approximately on 8 mm of a nut on the left support of the engine.
  1. Remove the top cover of the engine.
  1. By means of the special elevating adaptation hang out the engine for a forward elevating eye approximately on 6 ÷ 8 mm.
  1. Turn out bolts of fastening of both final collectors and remove at first forward, and I will jam – a back collector in the direction down.
  1. Installation is made upside-down. Use new laying and nuts; a carving of hairpins grease with copper CRC paste.

Right collectors

 PERFORMANCE ORDER

  1. Turn out bolts of fastening of both final collectors and remove at first back, and I will jam – a forward collector in the direction down.
  1. Installation is made upside-down. Use new laying and nuts; a carving of hairpins grease with copper CRC paste.


«previous page
4.4.11. Removal and installation of the inlet pipeline
following page»
4.4.13. Removal and engine installation