BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.4.1. Removal and installation of a cover of a head of cylinders
4.4.2. Removal and installation of a head of cylinders, adjustment of phases GRM
4.4.3. Removal and installation of the top section of the pallet of a case
4.4.4. Removal and installation of the pallet of a case
4.4.5. Removal and installation of covers of a chain of GRM
4.4.6. Replacement of epiploons of a cranked shaft
4.4.7. Removal and flywheel installation
4.4.8. Removal and installation of belts of a drive of auxiliary units
4.4.9. Removal and installation of a damper of krutilny fluctuations and its nave
4.4.10. Removal and installation of the oil pump
4.4.11. Removal and installation of the inlet pipeline
4.4.12. Removal and installation of final collectors
4.4.13. Removal and engine installation
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-4-11-snyatie-i-ustanovka-vpusknogo-truboprovoda.html

4.4.11. Removal and installation of the inlet pipeline

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the storage battery.
  2. Disconnect from the inlet pipeline electroconducting of the engine and take her aside.
  1. Disconnect from a butterfly valve a hose of EVAP and cables of management of a zaslonka. If necessary remove a butterfly valve in collecting (see. The section Removal and installation of the case of a throttle, replacement of its laying of Head of the Power supply system and production of the fulfilled gases).
  1. Disconnect from the fuel distributive highway hoses of a supply and fuel return, remembering an order of their connection and a place of their fastening by collars.
  1. Disconnect the union of the vacuum line from the amplifier of brakes.
  1. Remove a clip and extend PCV tube. Check a condition of a sealing ring of a tube and if necessary replace it.
  1. Give nuts, take prostavochny plugs and remove the inlet pipeline in the direction up.
  1. If necessary uncover (1) with the return valve.
  1. Check a condition of laying and a sealing ring of the valve. If necessary replace them.
  1. Center the inlet pipeline on two prostavochny plugs established on its left and right parties. Then establish the remained plugs and tighten nuts with demanded effort.
  2. Further installation is made upside-down.


«previous page
4.4.10. Removal and installation of the oil pump
following page»
4.4.12. Removal and installation of final collectors