BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
4.1. General information and preparatory operations
4.2. Check of kompressionny pressure
4.3. Engine check by means of the vacuum gage
4.4. Petrol M60/1 and M60/2 engines
4.4.1. Removal and installation of a cover of a head of cylinders
4.4.2. Removal and installation of a head of cylinders, adjustment of phases GRM
4.4.3. Removal and installation of the top section of the pallet of a case
4.4.4. Removal and installation of the pallet of a case
4.4.5. Removal and installation of covers of a chain of GRM
4.4.6. Replacement of epiploons of a cranked shaft
4.4.7. Removal and flywheel installation
4.4.8. Removal and installation of belts of a drive of auxiliary units
4.4.9. Removal and installation of a damper of krutilny fluctuations and its nave
4.4.10. Removal and installation of the oil pump
4.4.11. Removal and installation of the inlet pipeline
4.4.12. Removal and installation of final collectors
4.4.13. Removal and engine installation
4.5. M62 engine
4.6. Diesel M57 engine
4.7. Diesel M67 engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
14. Onboard electric equipment
15. Electric equipment schemes




0c1943ba

4-4-10-snyatie-i-ustanovka-maslyanogo-nasosa.html

4.4.10. Removal and installation of the oil pump

 PERFORMANCE ORDER

  1. Remove the pallet of a case of the engine (see. Section Removal and installation of the pallet of a case).
  1. Remove a protective casing of an asterisk of the oil pump for what, depending on execution, turn out bolts of its fastening, or liberate a casing from clamps.
  1. Give a nut and remove an asterisk with a chain.
  1. Turn out bolts of fastening of the pump and remove it.
  1. If necessary compress a lock cutting ring and take the reduktsionny valve.
  1. Installation is made upside-down. Adjust a chain tension to value A = 10 ± 2 mm, turning a prutkovy key the carving plug in the oil pump.


«previous page
4.4.9. Removal and installation of a damper of krutilny fluctuations and its nave
following page»
4.4.11. Removal and installation of the inlet pipeline