BMW 7_ая the E38 series from 1994 to 2002
1. Introduction
2. Governing bodies and operation receptions
3. Settings and routine maintenance of the car
4. Engine
5. Systems of cooling of the engine, heating, ventilation and air conditioning
6. A power supply system and production of the fulfilled gases
7. Systems of electric equipment of the engine
8. Manual box of gear shifting and coupling
9. Automatic transmission
10. Kardanny and power shafts, reducer, differential and stupichny assemblies
11. Brake system
12. Suspension bracket and steering
13. Body
13.1. External equipment and body elements
13.2. Salon equipment
13.2.1. Removal and installation of window regulators
13.2.2. Removal and installation of furnish and sound insulation of a forward door
13.2.3. Removal and installation of furnish and sound insulation of a back door
13.2.4. Removal and installation of panels of furnish of racks of a body and ceiling
13.2.5. Removal and installation of furnish of the dashboard
13.2.6. Removal and shelf installation behind a back seat and shtorka of back glass
13.2.7. Removal and installation of overlays of thresholds of doors
13.2.8. Removal and installation of elements of furnish of a luggage compartment and its cover
13.2.9. Removal and installation of forward seats
13.2.10. Removal and installation of a back seat
13.2.11. Removal and installation of seat belts
13.2.12. Removal and installation of a cover of the top hatch
14. Onboard electric equipment
15. Electric equipment schemes


13-2-12-snyatie-i-ustanovka-kryshki-verkhnego-lyuka.html

13.2.12. Removal and installation of a cover of the top hatch

Do not apply force when moving the movable panel of a roof.

Removal

 PERFORMANCE ORDER

  1. Open a cover on 250 mm, verify bolts (2) so that the opening became free, and close a cover.
  1. Shortly press a key of opening of the top hatch and again stop it. Thus the back part of a cover should fall by 2 ÷ 4 mm.
  2. Slowly move the movable panel of a ceiling up to the end back and close a cover.

After that it is not allowed to make active a cover in the Open direction (danger of damage of the mechanism).


  1. Give nuts and uncover the top hatch movement up and back.

At installation replace nuts or process old nuts Loctite 270 structure.

Installation

 PERFORMANCE ORDER

  1. As appropriate hook in front for a sled (2) left and right adjusting levers (1).
  1. Palm wring out a forward part of a cover with left and on the right side from below up. Thus the cover should not rise. Adjusting levers along the edges of a cover should enter into gearing as appropriate.
  1. Wring out an elevating and movable cover of the hatch forward and tighten nuts (2) by hand.
  1. Lower a back part of a cover of the top hatch on mm size 2 ÷ 4.
  2. Slowly move the movable panel of a ceiling up to the end forward.
  3. Open a cover of the top hatch approximately on 250 mm, carefully wring out it up, screw fixing bolts (2 on an illustration) from the left and right side and tighten them.